529
able to confine myself
lunits -
within Pranowou
is,
f
The result of my examination to facts my own experience in the design of such buildings goes, very unfavorable the proposed Korpital : and in order that some what I have said may not be open to the usual observation that it is
Forsaries
6
Ya
au
to criticise than to propose a remedy quite ready to submit new plans indicating the
manner in which I think the Kropital
should be arranged : in fact I have,
at the Board
taugh
excavation, an outline of my Observations, being a
sketch of the proposal and have
the plans of the different floors sufficiently
advanced
to
require only
a little
work
for completion if it should be considered
that the objections I have brought forward
to the proposed Plans are entitled to
any weight.
After writing this I have heard from Mr Authority Kennedy that a sum of $20,000 has been expended
upon cutting out a site ._ I can find in the papers
only
intimation of this having been done and only
in the long
Report of the
the Committee in 1840 that
the Lunacyon General
Considered
that
the site could be drained and built
for
$2,000
$12,000: in the instructions
to the Architect the
Surveyor General
was
silent upon the desirability of draining
Page 540
Page 541
529
able to confine myself
lunits -
within Pranowou
is,
f
The result of my examination to farts my own experience in the design of such buildings goes, very unfavorable the perposed Korpital : auch in order that mom what I have blay may not be open the usual observation that it is
Forsaries
6
Ya
au
to criticice than to perfose a remedy quite ready to submit Kew plans indicating the
manner un co hich I think the Kropitel
should be arranged : in fact I have,
at the Bord
taugh
eccosuction, an of ony Orceversacidian, feien a
sketch of any perpisal and have
the places of the different floors sufficiently
advanced
to
require only
A
that live
for completion if it should be considered
>
that the objecterns I have brought forward
to the proposed Plans ausentilled to
any weight.
After writing this I have heaeol from for Autheur Femmedy that a team of $ 20,000 has hem expended
plation
upon cutting out a site ._ I can find in the paper
authe
leo
auly
reform of this having been done and only
intimation in the Leng
arry bager Report of the
the Committee in 7540 that
the Lunaryon General
Considered
that
the site could be drained and builled
fr
2000
$12,000: in the unstuction
to the Architect the
suwaya General
вер
there upon the deniability of dritimbing
переви
Page 540Page 541
No comments yet.
Private notes are available after approval.